The ARIADNE Structure in Numbers

 

As of this point ARIADNE has been presented as a methodology composed out of two methodological frameworks (one for the development and one for the acquisition of technology) with twenty (20) process models in each framework.

That is one methodology Χ(times) 2 dimensions (frameworks) Χ 20 process models Χ 5 versions = 200 process models.    Actually the process models are 400, since there are 200 for the software oriented project and as many for the non-software oriented ones.    The presentation focuses on the processes related to the Software Intensive Projects since they are the most difficult to manage and ARIADNE can be extremely useful towards managing software complexity from either the development of the acquisition point of view. 

The structure of each process model is so mature and complete that it can be considered as a methodology by itself supporting a specific process.  A Testing Methodology for example or a Contract Management Methodology.

 

The SYSTEM TESTING PHASE for example in its Advanced Version is composed from a quite large number of process elements as shown in table 1 .



Process Elements

Number

 Stages

12

 Steps (one by one)

160

 Deliverables

14

 Forms

51

 Inspections

36

 Restrictions (Critical Points)

40

 Meetings

72

 Milestones

28

 
 

The total number of process elements in the 20 phases of the ARIADNE-SE (Systems Engineering) Methodology, in its Advanced Version, is presented in  table 2.

 

Process Elements

Number

 Phases

     20

 Stages

   236

 Steps (one by one)

2.820

 Deliverables

   270

 Forms

1.812

 Inspections

   730

 Restrictions (Critical Points)

   650

 Meetings

1.135

 Milestones

   520

  

 

Likewise the total number of process elements in the 20 phases of the ARIADNE-PM (Project Management / Acquisition Management) Methodology, in its Advanced Version, is presented in the table 3. 


   

Process Elements

Number

  Phases

     20

 Stages

   231

 Steps (one by one)

2.905

 Deliverables

   268

 Forms

1.640

 Inspections

   710

 Restrictions (Critical Points)

   692

 Meetings

1.256

 Milestones

   560

 


The Grant TOTAL of process elements in all 40 Phases of the ARIADNE Methodology in the Advanced Version are presented in table 4.

 

  Process Elements

Number

Phases

40

 Stages

   467

 Steps (one by one)

5.725

 Deliverables

   538

 Forms

1.992

 Inspections

 1.440

 Restrictions (Critical Points)

 1.342

 Meetings

 2.391

 Milestones

1.080

 

The following figure presents a hierarchical presentation of the entire ARIADNE structure breakdown, starting from the first level, one unit, that presents the methodology down to the sixth level that presentes the structure of a process model.